Navigation Menu+

Construction…

Posted on Sep 12, 2009 by in Techniques, Updates |

Once the paint had been successfully peeled I started construction of the feed store, though I must confess it seemed a little bit strange getting all the paint to peel before the building was even constructed.  I used Zap-A-Gap medium to glue all of the parts together, which worked pretty well.  On the next kit I think I will try some of the other blends to see if I can find something better.  Constant reference to the plans assisted in the placement of internal supports and correct identification of parts.  I assembled the main part of the building and the office as two separate parts.  This picture shows both sections with the floor installed and chalk weathered in the main building:

The weathering on the floor of the main section was made surprisingly easy with the use of pastel chalks, obtained from my local craft store.  I used a sheet of 220 grit sandpaper (test a couple of different grits to find what works best for you) and rubbed brown, black, gray, and red to create little piles of chalk.  I then used a fairly stiff brush and took random samples of the chalk and scrubbed it into the wood of the floor.  This created a well worn effect, which I sealed using Testors Dullcote after I had reached the desired amount of wear.  Notice how it brings out the detail of the cracks in the floor.  This techniques has many uses in weathering and will come back in multiple places on this build.