Tuesday evening was the scene of a successful operating session (running the display like a real railroad)…after the quick track cleaning. Quite a few trains were running, with no major problems…all in all a successful operation. Check back next month for the next operating session. […]
Work has been continuing at a feverish pace in the area of the HO display representing San Leandro. The building representing the Del Monte fruit packing plant have been installed with only detailing and lighting left to complete. A backdrop has been installed to tie the entire scene together, and painting is continuing on the […]